Draft-Draft-Draft Only
Hazard Mitigation Plan Update
2011
Community of
Adoption Date: -- Has Not Been Entered --
Primary Point of Contact
Michael A. Scullin
General Manager
Arrowbear Park County Water District
P.O. Box 4045, 2365 Fir Drive
909-867-2704 (Office)
APCWD@eee.org
Planning Team and Promulgation Authority
This 2011 Hazard Mitigation Plan (HMP) for Arrowbear Park County Water District was:
Prepared by:
Signature: ________________________________ Date:__________
Name: Seth Burt
Title: Fire Chief, Arrowbear Fire Dept.
Organization:
Signature:________________________________ Date:__________
Name: Laura Dyberg
Title: President, Mtn. Rim Firesafe Council
Organization: Mountain Rim Firesafe Council
Signature: ________________________________ Date:__________
Name: Terisa Bonito
Title: President, Mtn. Rim Firesafe Council, Arrowbear/ Run Spgs Chapter
Organization: Mountain Rim Firesafe Council
Signature: ________________________________ Date:__________
Name: Kent Jenkins
Title: Compliance Officer
Organization: Running Springs Water District
Signature: ________________________________ Date:__________
Name: Mark Bunyea
Title: Director,
Organization: Arrowbear Park County Water District
Signature: ________________________________ Date:__________
Name: Pat Oberlies
Title: Director,
Organization: Arrowbear Park County Water District
Signature: ________________________________ Date:__________
Name: Antoinette Weber
Title: Private Citizen
Organization:
Approved by:
Signature: ________________________________ Date:__________
Name: Rick Weber
Title: Chairperson,
Organization: Arrowbear Park County Water District
Signature: ________________________________ Date:__________
Name: Michael Scullin
Title: General Manager
Organization: Arrowbear Park County Water District
Table of Contents
Section 1 Introduction................................................................................................................. 5
1.1 Purpose of the Plan........................................................................................................... 5
1.2 Authority.......................................................................................................................... 5
1.3 Community Profile............................................................................................................. 5
1.3.1 Physical Setting.......................................................................................................... 5
1.3.2 History....................................................................................................................... 6
1.3.3 Demographics............................................................................................................. 6
1.3.4 Existing Land Use....................................................................................................... 6
1.3.5 Development Trends.................................................................................................... 7
Section 2 Plan Adoption.............................................................................................................. 7
2.1 Adoption by Local Governing Body...................................................................................... 7
2.2 Promulgation Authority...................................................................................................... 8
2.3 Primary Point of Contact.................................................................................................... 8
Section 3 Planning Process......................................................................................................... 8
3.1 Preparing for the Plan........................................................................................................ 8
3.1.1 Planning Team............................................................................................................ 9
3.2 Coordination with Other Jurisdictions, Agencies, and Organizations..................................... 10
3.3 Public Involvement/Outreach............................................................................................. 10
3.4 Assess the Hazard.......................................................................................................... 11
3.5 Set Goals....................................................................................................................... 11
3.6 Review and Propose Mitigation Measures.......................................................................... 11
3.7 Draft the Hazard Mitigation Plan........................................................................................ 12
3.8 Adopt the Plan................................................................................................................ 12
Section 4 Risk Assessment......................................................................................................... 12
4.1 Hazard Identification........................................................................................................ 12
4.1.1 Hazard Screening Criteria........................................................................................... 12
4.1.2 Hazard Assessment Matrix........................................................................................ 13
4.1.3 Hazard Prioritization.................................................................................................. 13
4.2 Hazard Profile................................................................................................................. 14
4.2.1 Wildfires Hazard........................................................................................................ 15
4.2.2 Earthquakes Hazard.................................................................................................. 18
4.2.3 Drought Hazard......................................................................................................... 21
4.2.4 Severe Winter Storms................................................................................................ 22
4.3 Inventory Assets.............................................................................................................. 23
4.3.1 Population................................................................................................................ 23
4.3.2 Buildings.................................................................................................................. 23
4.3.3 Critical Facility List.................................................................................................... 24
4.4 Vulnerability Assessment................................................................................................. 24
4.4.1 Methodology............................................................................................................. 24
4.4.2 Wildfires Vulnerability Assessment............................................................................. 24
4.4.3 Earthquake Vulnerability Assessment......................................................................... 25
4.4.4 Drought Vulnerability Assessment.............................................................................. 25
4.4.5 Severe Winter Storms Vulnerability Assessment.......................................................... 25
Section 5 Community Capability Assessment............................................................................ 26
5.1 Agencies and People....................................................................................................... 26
5.2 Existing Plans................................................................................................................. 27
5.3 Regulations, Codes, Policies, and Ordinances................................................................... 28
5.4 Mitigation Programs......................................................................................................... 28
5.5 Fiscal Resources............................................................................................................ 29
Section 6 Mitigation Strategies.................................................................................................. 29
6.1 Overview
6.2 Mitigation 5-Year Progress Report..................................................................................... 29
6.3 Mitigation Goals, Objectives, and Projects......................................................................... 29
6.3.1....... Wildfires................................................................................................................... 30
6.3.2....... Earthquake............................................................................................................... 30
6.3.3....... Drought.................................................................................................................... 31
6.3.4....... Severe Winter Storms................................................................................................ 31
6.4 Mitigation Priorities................................................................... .......................................32
6.5 Implementation Strategy... ...............................................................................................32
Section 7 Plan Maintenance...................................................................................................... 33
7.1 Monitoring, Evaluating and Updating the Plan..................................................................... 33
7.2 Implementation through Existing Programs........................................................................ 33
7.3 Continued Public Involvement............................................................................................ 34
Appendix A............................................................................................................................... 35
Table A.1........................................................................................................................ 36
Table A.2........................................................................................................................ 37
Appendix B............................................................................................................................... 38
Fire Hazard Map.............................................................................................................. 39
Earthquake Faults Hazard Map......................................................................................... 40
Liquefaction Hazard Map.................................................................................................. 41
Appendix C............................................................................................................................... 42
Table C.1........................................................................................................................ 43
Table C.2........................................................................................................................ 44
Table C.3........................................................................................................................ 45
Exhibit C.1...................................................................................................................... 46
Section 1 – Introduction
1.1 Purpose of the Plan
Emergencies and disasters cause death or leave people injured or displaced, cause significant damage to our communities, businesses, public infrastructure and our environment, and cost tremendous amounts in terms of response, recovery dollars, and economic loss.
Hazard mitigation reduces or eliminates loss of life and property. After disasters, repairs and reconstruction are often completed in such a way as to simply restore to pre-disaster conditions. Such efforts expedite a return to normalcy; however, the replication of pre-disaster conditions results in a cycle of damage, reconstruction, and repeated damage. Hazard mitigation ensures that such cycles are broken and that post-disaster repairs and reconstruction result in a reduction in hazard vulnerability.
While we cannot prevent disasters from happening, their effects can be reduced or eliminated through a well-organized public education and awareness effort, preparedness and mitigation. For those hazards which cannot be fully mitigated, the community must be prepared to provide efficient and effective response and recovery.
1.2 Authority
The Disaster Mitigation Act of 2000 (DMA 2000), Section 322 (a-d) requires that local governments, as a condition of receiving federal disaster mitigation funds, have a mitigation plan that describes the process for identifying hazards, risks and vulnerabilities, identify and prioritize mitigation actions, encourage the development of local mitigation and provide technical support for those efforts. This mitigation plan serves to meet those requirements.
1.3 Community Profile
1.3.1 Physical Setting
The District covers approximately 1.65 square miles in the
This region embraces the mountain resorts and recreational areas around Gregory, Arrowhead, and Big Bear lakes, in San Bernardino Natl. Forest.
The mountain area served by the Arrowbear Park Water District runs west to East between Running Springs on the West and the
During the winter months the cold fronts, which approach from the southwest, release moisture as they lift over the mountains. This can often produce double digit rainfall amounts per storm. Northerly winds usually follow storm events which clear the area.
1.3.2 History
The community of
1.3.3 Demographics
The local economy is driven by recreation and tourism. The Snow Valley Ski area, within the Hilltop Community Plan area, offers opportunities for skiing and snow boarding. The local lakes provide opportunities for fishing, and the National Forest provides additional opportunities for outdoor recreation such as hiking and camping. Downtown Running Springs is the primary commercial area within the community plan area and provides a mixture of retail establishments, restaurants, offices, and service uses.
Tourism is a primary economic generator for the area contributing hundreds of thousands of dollars a year, and providing full-time as well as part-time jobs for local residents. The entire resort area of the San Bernardino Mountains, from Crestline to Big Bear plays host to over five million visitors per year, primarily part-time vacation homeowners, their friends and guests, and travelers from the
The area offers a good selection of guest accommodations for overnight visitors as well as many individual cabin rental and property management agencies. Ski packages, weddings, and Eco-Tourism are major sources of visitor growth. The area is also popular for business conferences and inter-city cultural and educational exchanges.
1.3.4 Existing Land Use
The Arrowbear Park County Water District services approximately 15 commercial businesses within the district, including one gas station and one hardware/lumber center.
Estimates are that about 50% of the employed people who live in Arrowbear and the surrounding areas commute down the mountain on a daily basis.
The mountain area served by the Arrowbear Park Water District runs west to east between Running Springs on the West and the
The urban/wild land interface areas in which the San Bernardino National Forest Boundary meets the private land within the District have steep slopes, often exceeding 25%. The entire area is an extreme fire hazard area as designated by the
The orientation of the San Bernardino Mountain Range provides for extreme fire weather, especially in the fall of each year. The
The local housing market has been affected by the housing market collapse experienced during the past four years and also by the destruction of 180 neighboring homes in Running Springs caused by the Slide Fire Incident of 2007. New housing starts have only been several per year due to the poor state of economy. There are no significant areas where new development is likely due to the fact that the town is surrounded by National Forest and has built out to that point.
1.3.5
The major employers in the area are:
Rim of the World School District
Mountains Community Hospital
Goodwins Market
Jensens Market
Deer Lick Lumber Company
Running Springs Water District
Snow Valley Mountain Sports Park
Local Real Estate, Title & Mortgage Co's
Local Camp and Conference Centers
Cal Trans Maintenance Yard
San Bernardino County
US Forest Service
Section 2 Plan Adoption
2.1 Adoption by Local Governing Body
This 2011 Hazard Mitigation Plan (HMP) will be presented to the Arrowbear Park County Water District Board of Directors for adoption upon final FEMA approval of the plan. The Draft Resolution for acceptance of this local
The five-member Board of Directors consists of members within the community who are elected at large. The Board of Directors serves four-year terms, with terms overlapping. The Board of Directors develops the policies that govern the District. The District’s General Manager is appointed by the Board of Directors and oversees the day-to-day operations of the District.
The public is invited to join the District’s Board meetings, which are held at
The Point of Contact for information regarding this plan is:
Michael A. Scullin
General Manager
Arrowbear Park County Water District
(909) 867-2704 (Office)
E-mail: apcwd@eee.org
Section 3 Planning Process
The purpose of this section is to document the planning process that was taken to review, revise, and update the 2005
This
This section includes a list of the planning team members, a summary of the meetings held, coordination efforts with surrounding communities/groups, and all Public Outreach efforts.
The District’s local planning team reviewed the existing 2005
The update process consisted of:
· Documenting actions since 2005;
· Incorporating new data;
· Engaging the Planning Team;
· Conducting Public Outreach; and
· Adoption of the Updated
To provide a better understanding of the Planning Process and give a timeframe of the effort, Table 3 in Appendix C shows the draft timeline for preparing the Draft
3.1.1 Planning Team
The 2011
Michael Scullin
General Manager
Organization: Arrowbear Park County Water District
Description of Involvement: Team Leader and planning team coordinator.
Seth Burt
Fire Chief, Arrowbear Fire Dept.
Organization: Arrowbear Lake Volunteer Fire Department
Description of Involvement: Identify critical infrastructure for fire protection.
Laura Dyberg
President, Mtn. Rim Firesafe Council
Organization: Mountain Rim Firesafe Council
Description of Involvement: Identify community needs and hazards for fire protection.
Terisa Bonito
Title: President, Mtn. Rim Firesafe Council, Arrowbear/Run Spgs Chapter
Organization: Mountain Rim Firesafe Council
Description of Involvement: Identify community needs and hazards for fire protection.
Kent Jenkins
Compliance Officer
Organization: Running Springs Water District
Description of Involvement: Identify and prioritize critical needs for water distribution system.
Mark Bunyea
Director, Arrowbear Park CWD
Organization: Arrowbear Park County Water District
Description of Involvement: Identify and prioritize waste water critical needs in district.
Pat Oberlies
Director, Arrowbear Park CWD
Organization: Arrowbear Park County Water District
Description of Involvement: Identify and evaluate community needs.
Antoinette Weber
Private Citizen
Organization:
Description of Involvement: Identify and evaluate community needs.
3.2 Coordination with Other Jurisdictions, Agencies, and Organizations
San Bernardino County Fire Department Office of Emergency Services (OES) is coordinating the update of the San Bernardino County Operational Area Multi-Jurisdictional Multi-Mitigation Plan. The current San Bernardino County Operational Area Multi-Jurisdictional Multi-Hazard Mitigation Plan process consists of information from 55 local HMPs, which are included as an annex to the County’s Operational Area plan. The 55 participants include all 24 incorporated cities and towns, 30 special districts, and the unincorporated county. The District is a participating special district within the San Bernardino County OES Multi-Jurisdictional Multi-Hazard Mitigation Plan.
The District participated in bi-weekly meetings to coordinate and receive support for their HMP with the County’s Multi-Jurisdictional Multi-Hazard Mitigation Plan. The support included receiving technical expertise, resource material and tools, not only to expedite the HMP update process, but also to ensure that the updates are in compliance with federal requirements of the program. The tools, resource material, and other project related information were maintained on a project portal (https://tmsprojects.icfi.com/sbhmpupdate/default.aspx) to ensure the same information is available to all participants.
Also, interaction with other local water purveyor’s proved valuable in the development of the mitigation projects for the plan. All the water purveyors with the
3.3 Public Involvement/Outreach
A District planning team was formed for the development of the plan and the District followed their standard plan development process which includes a public review process. Some members of the planning team also serve as officers of the local Running Springs Area Chamber of Commerce to embrace a wider spectrum of input from the community at large. All projects have to be approved by the District’s Board of Directors at their regularly scheduled meetings. All Board meetings are advertised ahead of time and are open to the public and the public may ask questions at these meetings. This method was used for the 2011 HMP, as was done for the 2005 HMP.
An effort was made to solicit public input during the planning process via Board Meetings. Two individuals signed up to be on the planning team as a result of open discussion at District Board Meetings. Information about the meetings and the HMP Plan update is posted on the District’s web site (http://www.arrowbearwater.org). Tables listing team meetings held and public outreach events are listed in Appendix A.
Because the District’s exact location of facilities is extremely sensitive, especially due to increased concerns for national security, only general locations have been included in this report.
3.4 Assess the Hazard
This HMP has been developed through an extensive review of available information on hazards: the District’s 2005 HMP, the District’s Emergency Response Plan, the District’s Water and Wastewater Master Plan, engineering drawings, and available geotechnical and geologic data from outside sources (for example, California Geological Survey for detailed fault investigation reports).
The assessment of various hazards was completed by the planning team because they have a wealth of personal experience working for the District, living in the area, and are familiar with the history of past hazardous events.
3.5 Set Goals
The District’s process of identifying mitigation goals began with assessing the 2005 HMP Goals and Objectives to determine if each of the mitigation goals were still valid. This review allowed the planning team to identify new Goals and Objectives.
The goals for the 2011 HMP were set by the planning team for the District because the members of the team knew the goals of the District with respect to its mission to provide our customers with a safe and reliable water supply, an efficient and reliable sewer collection system, and a modern competent fire protection/medical aid service delivered at a fair and effective price.
3.6 Review and propose Mitigation Measures
The process of identifying mitigation measures began with a review and validation of previous mitigation measures in the District’s 2005
The District’s planning team proposed and reviewed the mitigation measures because they knew the District’s mission. During one of our planning team meetings, we reviewed each of the projects from the 2005
The planning team identified and analyzed a range of specific mitigation actions and projects to be considered to reduce the effects of each hazard, with particular emphasis on new and existing water facilities. The planning team also formed an action plan describing how the mitigation projects identified should be prioritized and implemented. Special consideration was given to the costs and the cost benefits of the proposed projects.
The District’s implementation strategy included identifying a set of first tier objectives. These objectives are considered the highest priority and once implemented will result in substantial improvement in the overall reliability of the system.
Meetings (both in-person and virtual) were held with the planning team to solicit their input and review sections of the
3.7 Draft the Hazard Mitigation Plan
The General Manager of the District, who was on the planning team and also assisted the District in completing the 2005 HMP, drafted the HMP which was reviewed by the planning team prior to the HMP being finalized.
The updated HMPs will be reviewed against a FEMA-designed Crosswalk. The Crosswalk links the federal requirement, the section in the HMP where the information can be found, and a rating as to the level of compliance with the regulation.
3.8 Adopt the Plan
Upon finalizing the 2011 Update HMP by the Planning team, the HMP will be presented to the District’s Board of Directors at a regularly scheduled monthly public Board Meeting for adoption as written. The Draft Resolution for acceptance of this local
Section 4 Risk Assessment
The goal of mitigation is to reduce the future impacts of a hazard including property damage, disruption to local and regional economies, and the amount of funds spent to assist with recovery. However, mitigation should be based on risk assessment.
The purpose of this section is to describe the methodology taken to understand the hazards in the District’s service area. There are generally four (4) steps in this process: 1) identify and screen the hazards; 2) profile the hazards; 3) inventory the assets; and, 4) estimate losses.
A risk assessment involves measuring the potential loss from a hazard event by assessing the vulnerability of buildings, infrastructure, and people. It identifies the characteristics and potential consequences of hazards, how much of the District could be affected by a hazard, and the identification, vulnerability analysis, and risk analysis. Technically, these are three different items, but the terms are sometimes used interchangeably.
4.1 Hazard Identification
4.1.1 Hazard Screening Criteria
The intent of screening the hazards is to help prioritize which hazard creates the greatest concern to the District. Because the previous process (in 2005) used to rank hazards (Critical Priority Risk Index (CPR) software) is not being utilized, the alternative approach will be explained. The process that was implemented is logical and can be universally applied.
For this 2011 HMP Update, the District is utilizing a non-numerical ranking system for the hazard screening process.
A list of the natural hazards to consider was obtained from Federal Emergency Management Agency (FEMA) “State and Local Mitigation Planning how-to guide: Understanding Your Risks”, (FEMA 386-1). The District’s planning team reviewed each hazard on the list and using their experience with the hazards, the following conclusions were drawn.
Natural hazards considered by the District’s planning team include the following:
The following natural hazards were considered not to affect or be a risk to the District as decided by the District’s planning team:
4.1.2 Hazard Assessment Matrix
For this 2011
· For Probability, the rating options are: Highly Likely, Likely, or Somewhat Likely
· For Impact, the rating options are: Catastrophic, Critical, or Limited
Table 1 below is the screening assessment matrix used for the District’s hazards. The hazards have been placed in the appropriate/corresponding box/cell of the corresponding “Hazard Matrix” based on the planning team’s experience. A subset of this group of hazards is used for the prioritization of the hazards in the following section.
|
Probability |
Impact |
|||
|
|
Catastrophic |
Critical |
Limited |
|
|
Highly Likely |
|
|
|
|
|
Likely |
|
|
|
|
|
Somewhat Likely |
|
|
|
|
Table 1: Hazard Assessment Screening Matrix
4.1.3 Hazard Prioritization
Using the hazard screening criteria and assessment matrix discussed in the previous two sections, and the District’s planning team experience, the following four primary hazards were determined to be the most likely to affect the District:
1. Wildfires: Historically wildfires have impacted the District most in terms of loss of revenue and assets. Wildfires impact the revenue from water sales each time the public is evacuated due to a threatening wildfire, and assets have been lost due to damaged or destroyed structures caused by fire damage.
2. Earthquake: There are several active faults near the District which have affected the service area due to fault rupture. No major damage to District facilities have been recorded from past fault activity but the potential for catastrophic damage from a major earthquake is likely.
3. Drought Hazard: A severe drought could impact a major part of the population within the District because water sales are the primary business of the District. If there is reduced or no water to sell, the revenue to the District falls accordingly.
4. Severe Winter Storms: Winter storms have resulted in power outages causing a temporary interruption in pumping water to fill the district's water storage tanks. Additionally, water runoff can erode soil and expose water and sewer lines, causing them to be venerable to damage.
Table 2 below presents the summary results of prioritizing each hazard based on the level of risk. The “shaded” boxes are the top ranked hazards. As can be seen from the table, the hazards in the “shaded” boxes are the District’s priority (or high profile) hazards, while the hazards in the “white” boxes are the less critical/important hazards for the District.
| <>> |
Impact |
<>>
|||
|
|
<>>
Catastrophic |
<>>
Critical |
<>>
Limited |
<>>
|
|
Highly Likely |
<>>
Wildfires |
<>>
Drought |
<>>
|
<>>
|
|
Likely |
<>>
|
<>>
|
<>>
Severe Winter Storms |
<>>
|
|
Somewhat Likely |
<>>
|
<>>
|
<>>
|
<>>
|
Table 2: Hazard Prioritization Matrix
The four high profile hazards for the District are wildfires, earthquake, severe winter storms, and drought. While other hazards are profiled in the following sections for completeness, the District’s priority and focus for the mitigation projects will be for only the four high profile hazards.
4.2 Hazard Profiles
4.2.1 Wildfires Hazard
The following section describes the hazard and then details the historical events associated with this hazard for the Arrowbear Park County Water District. See Appendix B for Fire Hazard Map.
General Definition:
There are three different classes of wildland or wildfires. A surface fire is the most common type and burns along the floor of a forest, moving slowly and killing or damaging trees. A ground fire is usually started by lightning and burns on or below the forest floor. Crown fires spread rapidly by wind and move quickly by jumping along the tops of trees. Wildfires are usually signaled by dense smoke that fills the area for miles around. Wildfires present a significant potential for disaster in the southwest, a region of relatively high temperatures, low humidity, and low precipitation during the summer, and during the spring, moderately strong daytime winds. Combine these severe burning conditions with people or lightning and the stage is set for the occurrence of large, destructive wildfires.
Historical Profile:
The following section lists and describes the historical events associated with this hazard in the Arrowbear Park County Water District.
1. Slide Fire 10/22/2007
Size of fire: 12,789 acres
Start time: 8:02am
Homes destroyed: 201, 3 outbuildings
The Slide or Green Valley Lake Fire burned near Green Valley Lake, east of Lake Arrowhead. The
2. Grass Valley Fire 10/22/2007
Size of fire: 1,247 acres
Start time: 5:08am
Homes destroyed: 174, 2 outbuildings
The Grass Valley Fire started on October 22 at about 05:08am, one-mile west of Lake Arrowhead. Relative humidity was 10% and winds were north and northeast at 18 mph gusting to 27 (per Rock Camp Remote Automated Weather Station [RAWS]; one-half-mile to the northeast). Vegetation consisted of ponderosa pine, Coulter pine, and black oak, with a Manzanita brush understory. Surface litter consisted of conifer needles, oak leaves, and branch wood. Fire behavior varied from surface fire and occasional torching to slope-driven crown runs (particularly on south and southeast facing slopes). The fire proceeded through the Grass Valley drainage, first impacting homes on the east flank, followed by homes approximately one-mile south from the point of origin.
3. Old Fire 10/25/2003
Size of fire: 91,281 acres
Acreage (59,448 ac.) in this report reflects the total historical fire spread of the Grand Prix, which has been managed as the Padua Fire. 42,515 acres of the Old Fire is currently being managed as part of the Grand Prix Fire.
211 total personnel
12 injuries
6 deaths
993 homes destroyed
10 commercial properties destroyed
Cost: $42,336,057
Hazard: Wildfires
Deaths: 6
Injuries: 12
Displaced People: 70,000
1/4 mi N/o Arrowhead Springs on Waterman cyn Rd.
San Bernardino, CA
4. Bridge Fire 9/5/2003
Bridge Fire
The Bridge Fire broke Friday afternoon 9-5-03 at 3:04pm along the west side of highway 330. The cause is under investigation and as yet undetermined. The Initial Attack Incident commander Mick McCormick reported it as five acres on arrival. By 8:30 in the evening the fire, which was called "erratic" by Forest Service Information Officer Tricia Abbas had consumed about 1500 acres. Humidity of around 50 % was causing the fire to lay down and slow the rate of spread. 65 engines and 24 hand crews made up a total manpower contingent of over 500 firefighters but more strike teams are being called in. There are already six strike teams on the mountain, plans for tonight were to get these crews rested and fed so they are prepared for whatever this fire throws at them tomorrow. As of 9:00 PM the fire was only 2% contained so there is much left to be done. Because the fire was erratic, it left many unburned islands of fuel. Crews did some burning out operations tonight when conditions were cooler with higher humidity to reduce these unburned areas.
1500 homes are potentially in the path of the fire with the leading edge of the fire only about 1 mile from the community of Fredalba.
Hazard: Wildfires
Deaths:
Injuries: 7
Displaced People: 1500
Hwy 330
5. Arrowhead Fire 5/31/2002
Fire started next to Arrowhead Springs Hotel at the bottom of Hwy 18. Fire consumed 2,688 acres with seven structures lost, no injuries.
Hazard: Wildfires
Deaths:
Injuries:
Displaced People:
Hwy 18
6. Hemlock Fire 6/14/2001
Fire escaped from prescribed burn on the south side of Running Springs. The fire burned to
Hazard: Wildfires
Deaths:
Injuries:
Displaced People:
7. Willow Fire 8/29/1999
The September 1999
60 homes destroyed.
Hazard: Wildfires
Deaths:
Injuries:
Displaced People:
8. Mill Fire 9/1/1997
The September, 1997 Mill Creek Fire prompted the formation of the Front Country Alliance in 1998. The fire spanned some 1500 acres and resulted in nearly two and a half million dollars in property loss. The fire suppression cost was in excess of a million dollars, involving 1600 personnel, 21 aircraft, 170 fire engines, and 3 injured fire fighters.
Hazard: Wildfires
Deaths:
Injuries:
Displaced People:
9. Panorama Fire
Hazard: Wildfires
Size of fire: 23,800acres
Homes destroyed: 280, 64 outbuildings
Deaths: 4
Injuries: 77
Cost: $41.5 million
Summarizing Risk:
4.2.2 Earthquake Hazard
The following section describes the hazard and then details the historical events associated with this hazard for the Arrowbear Park County Water District. See Appendix B for Earthquake Hazard Map.
General Definition:
An earthquake is a sudden, rapid shaking of the Earth caused by the breaking and shifting of rock beneath the Earth’s surface. For hundreds of millions of years, the forces of plate tectonics have shaped the Earth as the huge plates that form the Earth’s surface move slowly over, under, and past each other. Sometimes the movement is gradual. At other times, the plates are locked together, unable to release the accumulating energy. When the accumulated energy grows strong enough, the plates break free causing the ground to shake. Most earthquakes occur at the boundaries where the plates meet; however, some earthquakes occur in the middle of the plates.
Ground shaking from earthquakes can collapse buildings and bridges; disrupt gas, electric, water utilities, and phone service; and sometimes trigger landslides, avalanches, flash floods, fires, and huge, destructive ocean waves (tsunamis). Buildings with foundations resting on unconsolidated landfill and other unstable soil, and trailers and homes not tied to their foundations are at risk because they can b e shaken off their mountings during an earthquake. When an earthquake occurs in a populated area, it may cause deaths and injuries and extensive property damage.
Earthquakes strike suddenly, without warning. Earthquakes can occur at any time of the year and at any time of day or night. On a yearly basis, 70 to 75 damaging earthquakes occur throughout the world. Estimates of losses from a future earthquake hazard in the
There are 45 states and territories in the
There are three earthquake faults located near the District’s service area. They are the
While there have been many earthquakes in and around the District’s service area, earthquakes have caused no damage to District facilities. In 1992, the Big Bear – Landers Earthquake caused minor upset with books and papers falling from office shelves but no other difficulties were noted.
Since 1992 the District has not experienced any damage to any facilities resulting from earthquakes.
Historical Profile:
|
Earthquake Name |
Date of Earthquake |
Magnitude of Quake |
Damage Description |
||
|
Wrightwood Earthquake |
|
7.5 |
40 deaths. |
||
|
|
|
5.7 |
Landslides, heavy damage to buildings in |
||
|
|
|
6.5 |
San Jacinto & Hemet had severe damage. Six deaths. Chimneys thrown down and walls cracked in |
||
|
|
|
6 |
Chimney’s toppled. |
||
|
|
|
6.8 |
Most damage in San Jacinto and |
||
|
|
|
6.3 |
Chimney’s toppled, broken windows, 2 critical injuries, no deaths, |
||
|
|
|
6.0 |
Few chimneys damaged, some plaster cracked, a few windows broken. Minimal damage mostly due to sparsely populated area. |
||
|
|
|
6.6 |
Little damage due to remote location, felt over a large area. Rockslides |
||
|
Desert |
|
6.0 |
Widespread damage. In |
||
|
1954 |
|
6.4 |
Minor widespread damage. Parts of |
||
|
|
|
6.5 |
Largest most damaging earthquake in 16 years. Damage across most of |
||
|
Lytle Creek |
|
5.2 |
Landslides, rock falls, 4 injuries, |
||
|
|
|
5.5 |
Landslides. Windows and dishes broken. Fire broke out in Rancho Mirage due to a gas line rupture in an empty home. |
||
|
1988 |
|
4.7 and 5.4 respectively |
Landslides, damage to San Antonio Dam, 38 minor injuries. Public-$4.87M; business-$4.7M; private-$2,4M; total-$12M; 501 homes and 115 businesses damaged or destroyed. |
||
|
|
|
5.6 |
29 injuries. Destruction or damage of 51 homes. Landslides. Damage over $4M. |
||
|
Joshua Tree |
|
6.1 |
32 minor injuries. |
||
|
Big Bear |
|
2 separate earthquakes – Big Bear - 6.4, Landers – 7.3. |
Landslides in |
||
|
Hector Mine |
|
7.1 |
Very remote location. Ruptured in both directions from the epicenter. |
||
Summarizing Risk:
· Probability: Highly Likely
· Magnitude/Severity: Catastrophic
4.2.3 Drought Hazard
The following section describes the hazard and then details the historical events associated with this hazard for the Arrowbear Park County Water District.
General Definition: A drought is a period of drier-than-normal conditions that results in water-related problems. Precipitation (rain or snow) falls in uneven patterns across the country. When no rain or only a small amount of rain falls, soils can dry out and plants can die. When rainfall is less than normal for several weeks, months, or years, the flow of streams and rivers declines. The water levels in lakes and reservoirs fall, and the depth to water in wells increases. If dry weather persists and water supply problems develop, the dry period can become a drought. The first evidence of drought usually is seen in records of rainfall. Within a short period of time, the amount of moisture in soils can begin to decrease. The effects of a drought on flow in streams and rivers or on water levels in lakes and reservoirs may not be noticed for several weeks or months. Water levels in wells may not reflect a shortage of rainfall for a year or more after the drought begins. A period of below-normal rainfall does not necessarily result in drought conditions. Some areas of the
Description: Because the District is in the business of selling water, drought can be a disastrous hazard to the District. A drought is defined as a series of years with less than average rainfall and typically lasts seven years. The District is currently experiencing a drought that started in 1998.
The 2009 California Water Plan states that Water Year 2009 was the third consecutive dry year for the state. Because of losses caused by this drought, the U.S. Department of Agriculture in September designated all of the counties with the
The fundamental drought impact to water purveyors is a reduction in available water supplies. As a result, historic occurrences of drought have encouraged water purveyors to review the reliability of their water supplies and to initiate planning programs addressing identified needs for improvement. In addition, public and media interest in droughts fosters heightened awareness of water supply reliability issues in the Legislature. More than 50 drought-related legislative proposals were introduced during the severe, but brief 1976-77 drought. About one-third of these eventually became law. Similar activity on drought-related legislature proposals was observed during the 1987-92drought. One of the most significant pieces of legislation was the 1991 amendment to the Urban Water Management and Planning Act, in effect since 1983 which requires water suppliers to estimate available water supplies at the end of one, two and three years, and to develop contingency plans for shortages of up to 50 percent.
If the current drought extends for the period that the U.S. Weather Service is currently forecasting, or worsens, the District could possibly have difficulty meeting its water supply demands without additional supplies. If the current drought extends for the period that the U.S. Weather Service is currently forecasting, or worsens, the District could possibly have difficulty meeting its water supply demands without additional supplies.
Summarizing Risk:
· Probability: Highly Likely
· Impact: Critical
4.2.4 Severe Winter Storms
The following Section describes the hazard and then details the historical events associated with this hazard for the Arrowbear Park County Water District. See Appendix B for Liquefaction Hazard Map.
General Definition: A winter storm can range from moderate snow over a few hours to blizzard conditions with high winds, freezing rain or sleet, heavy snowfall with blinding wind-driven snow and extremely cold temperatures that lasts several days. Some winter storms may be large enough to affect several states while others may affect only a single community. All winter storms are accompanied by cold temperatures and blowing snow, which can severely reduce visibility. A severe winter storm is one that drops 4 or more inches of snow during a 12–hour period, or 6 or more inches during a 24 hour span. An ice storm occurs when freezing rain falls from clouds and freezes immediately on impact. All winter storms make driving and walking extremely hazardous. The aftermath of a winter storm can impact a community or region for days, weeks, and even months. Storm effects such as extreme cold, flooding, and snow accumulation can cause hazardous conditions and hidden problems for people in the affected area.
People can become stranded on the road or trapped at home, without utilities or other services. Residents, travelers and livestock may become isolated or stranded without adequate food, water and fuel supplies. The conditions may overwhelm the capabilities of a local jurisdiction. Winter storms are considered deceptive killers as they indirectly cause transportation accidents, injury, and death resulting from exhaustion/overexertion, hypothermia and frostbite from wind chill, and asphyxiation; house fires occur more frequently in the winter due to lack of proper safety precautions.
"Wind chill" is a calculation of how cold it feels outside when the effects of temperature and wind speed are combined. On November 1, 2001, the National Weather Service (NWS) implemented a replacement Wind Chill Temperature (WCT) index for the 2001/2002 winter season. The reason for the change was to improve upon the current WCT Index, which was based on the 1945 Siple and Passel Index. A winter storm watch indicates that severe winter weather may affect your area. A winter storm warning indicates that severe winter weather conditions are definitely on the way. A blizzard warning means that large amounts of falling or blowing snow and sustained winds of at least 35 miles per hour are expected for several hours.
Description: Arrowbear Park County Water District receives an average of about 60 inches of snowfall each year. During the winter months, nighttime temperatures fall into the high 20's C and low 30's C. During severe storms, temperatures can reach the teens. Extremely low temperatures can cause freezing on the water mains and customer service lines.
Historical Profile:
Recent Local Severe Winter Storms
|
Date |
Duration |
Rainfall Est. |
Description |
|
|
Eight days |
40” |
Wash outs/Road Closed/Power outs |
|
|
Three days |
12” |
Wash outs/Road Closed/Power outs |
Summarizing Risk:
· Probability: Likely
· Impact: Limited
4.3 Inventory Assets
This section provides an overview of the assets in the Arrowbear Park County Water District and the hazards to which these facilities are susceptible. Tables 1 and 2 in Appendix C list hazard risk assessments for selected District buildings.
4.3.1 Population
The total population of the District service area is approximately 850.
4.3.2 Buildings
As of December, 2010 the District operates and maintains the following facilities:
Water
Wastewater Collections
Fire Department
4.3.3 Critical Facility List
This section provides a listing of the critical facilities in Arrowbear Park County Water District. The primary contact for all the District facilities is the following:
Primary Contact: Michael A. Scullin, Gen Mgr.
Phone: (909) 867-2704
Fax: (909) 867-4736
Because the District’s exact location of facilities is extremely sensitive, especially due to increased concerns for national security, only general locations have been included in this section.
Table 3 below summarizes the critical facilities for the District.
|
Name |
Facility Type |
Description |
|
Water Dist. Admin Office |
Main Office for business |
2,400 sqft. Block Bldg. |
|
Sewer Collection Station |
Holding Tank/Pump Site |
200sqft. Wood Frame |
|
Well Site Fenced Yard |
Well Site Area Pump Bldgs |
4-100sqft. Wood Bldgs. |
|
Water Treatment Bldg. |
Equip. Bldg. for Treatment |
1,6sqft. Steel Bldg. |
|
Fire Station #271 |
Fire Station |
2,400sqft. Wood Frame |
|
Reservoirs |
Water Storage Site |
Steel Reservoirs (4) |
4.4 Vulnerability Assessment
4.4.1 Methodology
The facility replacement costs were calculated using the District’s accounting and insurance replacement values for construction of new facilities.
4.4.2 Wildfires Vulnerability Analysis
Population: Approximately 100% of the District’s population is vulnerable.
Critical Facilities: Approximately 67% of the District’s critical facilities are vulnerable.
The specific critical facilities vulnerable in the Arrowbear Park County Water District are:
Sewer Collection Station, Well Pump Houses (4), Water District Administration Office, Fire Station. Of the 6 critical facilities, 4 are critical generating the 67%.
Estimated Losses:
The estimated economic loss from this hazard is approximately $7M.
4.4.3 Earthquake Vulnerability Analysis
Population: Approximately 75% of the District’s population is vulnerable.
Critical Facilities: Approximately 100% of the District’s facilities are vulnerable.
The specific critical facilities vulnerable in Arrowbear Park County Water District are:
All 6 of the District’s critical facilities are considered vulnerable to Earthquake, including the water and wastewater transmission pipelines.
Estimated Losses: The estimated economic loss from this hazard is approximately $15.3M.
4.4.4 Drought Vulnerability Analysis
Population: Approximately 100% of the District’s population is vulnerable.
Critical Facilities: There would not be any physical structure damage to any facilities. Pumping costs would increase due to pumping water from lower levels. The District would also have to purchase additional imported water at a higher cost. Reservoirs and pipelines are not critical in drought conditions.
Estimated Losses: The estimated economic loss from this hazard is approximately $236,000.
4.4.5 Severe Winter Storms
Population: Approximately 50% of the District’s population is vulnerable.
Critical Facilities: Approximately 10% of the District’s facilities are vulnerable.
Estimated Losses: The estimated economic loss from this hazard is approximately $290,000.
Section 5 Community Capability Assessment
5.1 Agencies and People
This section describes the resources (staffing, agencies, departments, equipment) and tools (existing plans, policies, regulations, and ordinances), the District has in place that can assist promote and implement mitigation actions in the District’s service area. These capabilities generally fall into the following broad categories:
The District is located in the San Bernardino Mountains within
Other information regarding the District is as follows:
Storm Water Management Ordinances: No
Stream Management Ordinances: No
Zoning Management Ordinances: Yes
Subdivision Management Ordinances: No
Erosion Management Ordinances: No
Floodplain Management Ordinances: No
Floodplain Management Plan Published Date:
Floodplain Management Last Delineation Date:
Elevation Certificates Maintained: No
National Flood Insurance Program Community: No
National Flood Insurance Join Date:
NFPI Number:
NFPI Rating:
NFPI Rating Date:
Land Use Plan:
Land Use Plan Last Update:
Community Zoned: Yes
Zoned Date:
Established Building Codes: Yes
Building Codes Last Updated:
Type of Building Codes: 1998 California Building Code
Local Electric Utilities: Southern California Edison
Local Water Utilities: Arrowbear Park County Water District
Local Sewage Treatment Utilities: Running Springs Water District
Local Natural Gas Utilities: Southern California Gas
Local Telephone Utilities: Verizon
Fire Insurance Rating: Insurance Services Office, Inc. evaluated the area the District serves in June 1998. The majority of the District is Class 5.
Flood Insurance Claims:
5.2 Existing Plans
This section describes the existing plans for the Arrowbear Park County Water District.
The District has a Master Plan that has been prepared in 1999. The Master Plan identifies areas of needed improvement within the District to include but not limited to:
Additionally, the District is subject to the following San Bernardino County Plans as it is located in an unincorporated County area:
The San Bernardino County General Plan, Development Code, Hilltop Community Plan, and specific mountain overlay requirements give guidelines for community development and land use. A general description of each is listed below.
SAN BERNARDINO GENERAL PLAN: The San Bernardino County General Plan is a constitution for development. It utilizes both text delineating policy and maps to provide a guide for land use. It represents the county's official position on development and resource management. The position is expressed in goals, policies and actions regarding the physical, social, and economic environments, both now and in the long-range future (5 to 20 years).
Recognizing a need to update the 1989 General Plan, the Board of Supervisors has approved a General Plan Update (GPU) process that consists of two phases, the first of which was completed in 2002. During Phase I of the GPU, the Hogle-Ireland consultant team conducted a strategic analysis of the 1989 General Plan and Environmental Impact Report (EIR). The results of the Phase I consultant’s analysis can be found in their report, Evaluation for County of San Bernardino General Plan/EIR. The comprehensive recommendations contained in the Executive Summary (July 1, 2002) to this Report serve as the basis for the scope of work to be accomplished in Phase II of the General Plan Update.
PHASE II: The actual General Plan Update, Phase II, is anticipated to be a three-year process which began in mid-2003.
FIRE SAFETY (FS) OVERLAY DISTRICT as adopted by
Fire Safety Overlay Area 1 applies to Mountain area and provides construction requirements and mitigation requirements for hazardous fire area.
5.3 Regulations, Codes, Policies, and Ordinances
During extended droughts, the District may not be able to meet ultimate peak day summer demand for water supply. The District adopted a Water Conservation Plan on
5.4 Mitigation Programs
This section serves to identify the Previous Mitigation Plans, Projects, and Actions.
The District reviews all new construction plans to ensure that clearances from all district infrastructure is adequate, and determine if cross connection control protection is required. The Fire Department also reviews the plans to ensure that all new construction meets county fire code requirements for fire hydrant location and access, adequate fire suppression equipment access, and to ensure fire sprinkler code is followed.
All new District buildings have been designed and constructed to current building code standards.
The District’s Master Plan identifies areas of needed improvement for more efficient water/wastewater operations, infrastructure repair/improvement, and for increased fire flow capability.
Since 2004 the District has supported a Dead and Dying Tree Removal Program to aid in the removal of dead and dying trees that pose a fire hazard due to the Bark Beetle Infestation. This project has been very successful for the District and helped mitigate the high fire hazard presented by the mass die-off of pine trees around structures in the community.
The District has been aggressively complying with the San Bernardino County Fuel Reduction and Abatement Program.
The District maintains emergency potable water supplies, meals ready to eat, sleeping bags, blankets, and cots for employee and employee family use during a time of emergency to help ensure adequate District staffing during such an emergency.
The District maintains multiple emergency stand-by generators for emergency electrical power needs at the Sewer Lift Station, Fire Station, District Office Complex, and at the District’s well house/water treatment complex.
5.5 Fiscal Resources
Fiscal resources for the District include the following:
Section 6 Mitigation Strategies
6.1 Overview
The purpose of this analysis was to identify projects (actions) that helped the District meet the Goals and Objectives for each priority hazard. By going through this process, the District has identified hazards in our community, assessed which hazards pose the most significant risk, and identified projects to help reduce and/or eliminate the risk.
6.2 Mitigation 5-Year Progress Report
The District’s planning team reviewed each of the projects from the 2005 HMP and discussed the status of each project and reasons why they had or had not been implemented. This updated 2011 HMP identifies the completed, deleted, or deferred actions or activities from the 2005 approved plan as shown in table 5 as a benchmark for progress.
The updated plan includes in its prioritization, any new mitigation actions identified since the previous plan was approved or through the plan update process.
Table 4
|
Project |
Mitigation Action |
Completed |
Deferred |
Comments |
|
1 |
Wildfire- Replace pipeline in specific vulnerable areas |
Yes- 900’ 2” replaced with 8” plus 2 hydrants |
|
Ongoing goal. Additional areas studied for update goals. |
|
2 |
Wildfire/Winter Storms- Emergency Generators |
In Process |
|
2 facilities now equipped. Remaining areas studied and goals set. |
|
3 |
Drought- Upgraded emergency connection and pump station. |
Yes- Pump and valve facility built |
|
Upgraded facility to provide emergency water to 100% of District customers. |
|
4 |
Wildfire- Replace pipeline on |
No |
Yes |
Budget constraints delayed project. |
6.3 Mitigation Goals, Objectives, and Projects
Section 3.5 discusses the process of identifying goals with a preview and validation of the Goals and Objectives in the District’s 2005 HMP and the
The four high profile hazards for the District are wildfire, earthquake, drought, and severe winter storms. While other hazards were profiled in previous sections, the District’s priority and focus for the mitigation projects will be only for the four high profile hazards.
6.3.1 Wildfires
Description: The goal is to avoid or reduce damages to property. The District feels that strengthening structures, building new structures to current fire code, and fuel reduction to surrounding properties are critical to reducing the hazard wildfires present. These building codes help in the design and construction of District facilities that resist the forces of the fire hazard and help safety. Infrastructure improvements designed to improve fire flow capacity, increase available water supply, and more efficiently move the water from production to storage facilities is another critical area that will benefit mitigation capability.
Objectives:
Mitigation Projects:
6.3.2 Earthquakes
Description: Goal is to avoid or reduce damages to District and public property. Newer building codes designed to strengthen structures against seismic activity is critical for new construction, and upgrading existing structures where applicable is a priority for the District. These modern building codes and system upgrading will help the District’s structures/infrastructure resist the forces of nature and help ensure safety throughout the District’s service area.
Objectives:
Mitigation Projects:
6.3.3 Drought
Description: The goal is to improve drought preparedness, and to address the drought hazard through mitigation over long term planning.
Objectives:
Mitigation Projects:
6.3.4 Severe Winter Storms
Description: The goal is to improve severe winter storm preparedness, and improve the District’s ability to be more mobile during and after a severe winter storm. This can be accomplished through cold weather training, and acquiring updated equipment capable of accessing remote sites.
Objectives:
· Improve ability to mobilize during severe winter weather.
· Research equipment capable of safely accessing remote sites.
· Reduce employee exposure to severe winter weather elements.
Mitigation Projects:
6.4 Mitigation Priorities
The District’s implementation strategy included identifying a set of primary mitigation objectives. These objectives are considered the highest priority and once implemented will result in substantial improvement in the overall reliability of the District’s operating system. The remaining objectives, not included in the primary objectives, are considered desirable and will further enhance the operating reliability once the primary objectives are met.
The District’s objectives have been prioritized based on the following:
The District’s primary mitigation objectives include:
6.5 Implementation Strategy
For the successful mitigation of hazards identified in this plan and to meet the District’s goals within a reasonable time frame, an implementation strategy has been developed. The strategy includes identification of objectives, planning and development, cost estimates, and time frame for implementation.
For each project, the benefits and costs were identified and each project prioritized. The benefits include risk reduction, District goals, available funding, and time frame for implementation.
Arrowbear Park County Water District is a small organization and the implementation of the 2011 HMP will be a District wide activity and incorporated into the District’s plan of operation.
The implementation strategy has been developed based on the District’s Master Plan for capital improvements. Once these objectives are achieved, the secondary objectives can be developed in future revisions to the plan. Table 5 below lists the mitigation projects.
Table 5
|
Mitigation Projects |
Funding Source |
Time Frame |
Priority Ranking |
Estimated Cost |
|
New Well |
Dist. Reserves |
2011/ 2012 |
1 |
$352,000 |
|
Cougar Lane Pipeline |
Water Revenues |
2012- 2015 |
1 |
$241,600 |
|
Emergency Generator |
Water Revenues |
2013 |
2 |
$22,000 |
|
New Reservoir |
Dist. Reserves |
2015-2016 |
2 |
$440,000 |
|
CSA 79 Crossover |
Wastewater Revenues |
2012-2013 |
1 |
$80,000 |
Section 7 Plan Maintenance
7.1 Monitoring, Evaluating, and Updating the Plan
The Arrowbear Park County Water District will conduct an annual review of this Hazard Mitigation plan and will seek the input from representatives of local agencies, citizen representatives, and the San Bernardino County Office of Emergency Services.
Plan Last Updated March, 2005:
Description of Plan Maintenance Procedures: The HMP is a living document that reflects the District’s ongoing hazard mitigation activities. The process of monitoring, evaluating, and updating it will be critical to the effectiveness of hazard mitigation in the District’s service area.
Because of the high priority of the HMP, the mitigation actions are being included in the District’s Plan of Operation. The HMP will be incorporated into the District’s yearly budget planning process which will help to monitor progress towards HMP goals. This plan will be updated every five years. The District will also update the plan if there is a significant change in the basic assumptions, for example a major hazard event that highlights vulnerabilities in a system not anticipated at the present time. The District’s Board of Directors will review and recommend for approval any plan updates proposed by the planning team.
7.2 Implementation Through Existing Programs
The District currently plans capital improvements using the District Master Plan and the annual budget planning process.
After the District officially adopts the HMP, the District will use the Master Plan mechanism to have the mitigation strategies integrated into it. Specifically, the capital improvement planning that occurs in the future will contribute to the goals in the HMP. The planning team for the HMP will integrate capital improvement planning to implement high benefit low cost mitigation projects.
7.3 Continued Public Involvement
The District will continue to involve the public during the plan maintenance process over the next five years. The District, with its decision to integrate the HMP with the Master Plan, has ensured continued public involvement in this plan. Project approval is an open public process whereby the project is presented to the District’s Board of Directors in an open public meeting and by virtue of this; progress towards achieving the District’s goals and objectives identified in the HMP will also be open for public review and comment.
The District will continue to provide educational information to the public on our website to aid in conserving water to keep people informed of the drought and other hazards.
Appendix A
Table A.1- Planning Process & Public Involvement
Table A.2 Public Involvement/Outreach
The District’s planning team meetings and coordination with other jurisdictions meetings consisted of the following:
|
Date |
Activity |
||
|
10 June 2010 |
Mitigation Plan Kick-Off Meeting with |
||
|
01 July 2010 |
|
||
|
07 July 2010 |
SB County |
||
|
|
|
||
|
29 July 2010 |
|
||
|
30 July 2010 |
HMP Water Agency Coordination Meeting – Met with all Water District’s within the County, at East Valley Water District, to discuss HMP progress and updates for 2010 HMP. |
||
|
|
|
||
|
26 August 2010 |
|
||
|
23 September 2010 |
|
||
|
07 October 2010 |
|
||
|
12 October 2010 |
HMP Water Agency Coordination Meeting – Met with all Water District’s within the County, at East Valley Water District, to discuss HMP progress and updates for 2010 HMP. |
||
|
28 October 2010 |
|
||
|
02 December 2010 |
|
||
|
11 January 2011 |
|
||
|
07 December 2010 |
|
||
|
Date |
Activity |
|
|
20 January 2011 |
|
|
Table A.2 Public Involvement/Outreach
Other public involvement consisted of the following meetings:
|
Date |
Activity |
|
|
06 August 2010 |
District Board Meeting – Public Meeting – Board of Directors Introduced HMP Update and strategy, invited involvement |
|
|
08 October 2010 |
District Board Meeting – Public Meeting – Board of Directors Introduced HMP Update and strategy, invited involvement |
|
|
09 October 2010 |
Wildfire Awareness Week Public Open house – Co-hosted with Running Springs Water District –Public discussion and input. |
|
|
17 December 2010 |
District Board Meeting – Public Meeting – Board of Directors Gave status report update. Invited involvement. |
|
|
14 January 2011 |
District Board Meeting – Public Meeting – Board of Directors Introduced HMP Update and strategy, invited involvement |
|
|
08 February 2011 |
Added web page tab for Draft 2011 HMP Update and invited comments. |
|
Appendix B
Fire Hazard Map
Earthquake Faults Hazard Map
Liquefaction Hazard Map
Appendix C
C. Table 1- Hazard Identification Matrix
C. Table 2- Essential Facilities Risk Assessment
C. Table 3- Essential Facilities Risk Assessment
Timeline
C. Exhibit 1- Draft Resolution for 2011 HMP Update
C. Table 1- Hazard Identification Matrix
|
|
|
OWNER |
Arrowbear Lake Fire Protection District |
|
|
|
|
FACILITY TYPE |
Fire Stations |
|
|
|
|
|
# |
% |
|
|
|
Total # of Buildings |
1 |
|
|
Fire Hazards |
Fire Hazard Severity Zones - Local Responsibility Area |
Very High |
0 |
0% |
|
Fire Hazard Severity Zones - State Responsibility Area |
Very High |
1 |
100% |
|
|
High |
0 |
0% |
||
|
Moderate |
0 |
0% |
||
|
Flood Hazards |
Special Flood Hazard Areas Subject to Inundation by the 1% Annual Chance (100-year) Flood |
Zone A - no base flood elevations determined |
0 |
0% |
|
Zone AE - base flood elevations determined |
0 |
0% |
||
|
Zone AH - Flood depths of 1 - 3 feet (usually areas of ponding); base flood elevations determined |
0 |
0% |
||
|
Zone AO - Flood depths of 1 - 3 feet (usually sheet flow on sloping terrain); average depths determined. |
0 |
0% |
||
|
Other flood areas |
Zone X (Shaded) - areas of 0.2% annual chance (500 yr) flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile. |
0 |
0% |
|
|
Zone X Protected by Levee - areas protected by levees from the 1% annual chance flood |
0 |
0% |
||
|
Other Areas |
Zone D - areas in which flood hazards are undetermined, but possible |
1 |
100% |
|
|
Zone X (Unshaded) - areas determined to be outside the 0.2% annual chance (500-year) floodplain |
0 |
0% |
||
|
Dam Inundation |
|
In mapped dam inundation area |
0 |
0% |
|
Earthquake Hazards |
Liquefaction Susceptibility |
None |
1 |
100% |
|
Very Low |
0 |
0% |
||
|
Low |
0 |
0% |
||
|
Moderate |
0 |
0% |
||
|
High |
0 |
0% |
||
|
Very High |
0 |
0% |
||
|
Alquist-Priolo Earthquake Fault Zone |
Inside mapped fault zone |
0 |
0% |
|
C. Table 2- Essential Facilities Risk Assessment
|
|
|
In Person |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Conf Call |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|